40-prototype — make it work and ship in July
Everything required to deploy a working system at LBZF Pereira by July 2026.
Subfolders
Section titled “Subfolders”orientation/— what LBZF looks like today (factory, people, current workflow, raw data)hardware/— BoM, Jetson, cameras, network, install runbookml/— cycle-event detection, ROI calibration, training, failure modesbackend/— SQLite schema, FastAPI endpoints, Excel exporterfrontend/— lbzfai.com pages, Auth0 roles, localizationoperations/— install runbook execution, what changes for Ronald, on-calllbzf/— consent, privacy, labor law, procurement, budget, stakeholder comms
Plus architecture.md (when written) — one-page system diagram at the top of the folder.